What is a bill of materials?

A bill of materials (BOM) lists every part and material that goes into one finished item, and how many of each. It's the list you buy and build from, so it has to match the drawing revision you're making.

Published 27/10/2026. Sources checked 22/10/2026. Related template: Bill of materials template.

What is a bill of materials?

A bill of materials, or BOM, is the list of parts, sub-assemblies and raw materials needed to make one finished item, with the quantity of each. Each item you make has its own, matched to the drawing revision it was built from. Some industries call it a recipe or a formula.

In an ERP or MRP system, the BOM is what works out the material each works order needs.

What goes in a bill of materials?

A header naming the item and its drawing revision, then one line for each part or material, with enough on the line to buy it and cost it.

The header

  • The item's part number and name
  • The drawing and its revision
  • Who prepared it, and when
  • Whether it's a draft or released for use

Each line

  • Level, if it has sub-assemblies
  • Part number and description
  • Quantity per, and the unit
  • Make or buy, and the supplier
  • Unit cost
  • A scrap allowance, where parts are lost

A scrap allowance is a percentage added to a line for parts lost in setting up or production, so the quantity covers them.

What are the types of bill of materials?

BOMs differ in depth, single-level or multi-level, and in purpose, engineering or manufacturing. ERP systems add assembly, production and phantom BOMs.

Types of bill of materials, what each lists and what it's used for
TypeWhat it listsUse it for
Single-levelOnly the parts that go straight into the itemItems with no made sub-assemblies
Multi-level, or indentedEach part, then what goes into it, level by levelAnything with made sub-assemblies
Engineering BOMThe parts as the designer drew themDesign changes, and checking a customer's drawing
Manufacturing BOMWhat your works needs to build it, with blanks, consumables and packagingCosting, buying and works orders
Assembly BOMItems put together from other items, with little or no machine workKits, and items assembled to a customer's order
Production BOMItems made at work or machine centres, following a routingProduction orders
Phantom BOMA group of parts that's never made or stocked on its own, such as a fastener kitKeeping long BOMs tidy, and reusing one set of parts across several items

The last three are the terms Microsoft Dynamics 365 Business Central uses, and other ERP systems may name them differently.

What does a bill of materials look like?

Each part sits indented under the one it goes into, with its quantity and cost. A bracket assembly with two machined brackets, four dowel pins, four cap screws and a label comes to £6.79 of material and bought-in parts.

BA-400 bracket assemblyDrawing BA-400 rev B
0BA-400Bracket assemblyMade1 off
1BRK-210Mounting bracket, 6082-T6, clear anodised, 2 per BA-400Made2 off
2MAT-6082-106082-T6 plate, 10 mm, cut blank, 1 per BRK-210£4.302 × £2.15
1PIN-12Dowel pin, 6 x 20 mm, stainless, 4 per BA-400£1.524 × £0.38
1SCR-M6-16Cap screw, M6 x 16, stainless, 4 per BA-400£0.884 × £0.22
1LBL-01Part label, printed, 1 per BA-400£0.091 × £0.09
Material and bought-in parts, one assembly£6.79

Made parts show no cost of their own, because theirs is the material under them plus the time on the routing, which the job costing template adds up.

As a single-level BOM, the same assembly lists only the level 1 lines, and the blank moves to the bracket's own BOM.

The engineering BOM from the assembly drawing would list the brackets, pins and screws. The manufacturing BOM adds the blank each bracket is cut from and the label, because the works has to buy them.

The free bill of materials template has the same columns in Excel, Word and PDF.

Who uses a bill of materials?

Estimating takes the material cost of a quote from it. Purchasing multiplies it by the batch to know what to order, production builds from it, and an ERP or MRP system plans material from it.

For a batch of 100 bracket assemblies, that's 200 blanks, 400 pins, 400 screws and 100 labels, or £679.00 of material and bought-in parts.

How do you keep a BOM up to date?

Change it when the drawing changes, before the next quote or order goes out, and mark which revision is current. Keep the old one as well, so past jobs still make sense.

An ERP may keep these as BOM versions. In Business Central, each version has a starting date and stays valid until the next one starts, and Microsoft suggests a new one when an item is replaced or a customer needs a special version.

Write part numbers and revisions one way everywhere, one of the points in what to settle first before bringing AI into your ERP.

Can AI help with bills of materials?

Yes, with the reading and comparing. When a customer sends a new drawing revision, AI can read both parts lists and list every line that changed, so your BOM and your next quote are updated together. A person checks each change, and every quantity, before anything is bought or priced.

Give it

  • The old and new parts lists
  • Your current BOM
  • Your part numbering rules

A person checks

  • Every change it listed
  • Quantities at every level
  • The revision matches the order

The free check shows which quoting or order job is worth handing over first, and what it costs you now.