What is a quote?
A quotation, or quote, is a supplier's written offer to do a defined job at a fixed price, on stated terms, until a stated date. If the customer accepts it, usually with a purchase order, the quote becomes the basis of the order.
It answers the customer's enquiry, covered in What is an RFQ?
What does a quotation include?
What you're supplying and to which drawing revision, the quantity and price, any one-off charges, the lead time, delivery and payment terms, your assumptions and the date the price holds until. Say whether prices include VAT, at the standard UK rate of 20%.
See a filled-in quotation
Quotation Q-2026-0142
250 machined brackets
- Date
- 05/10/2026
- Valid until
- 04/11/2026
- Your reference
- RFQ 5531
- Quotation for
- [Customer company], [contact name]
- Prepared by
- [Name], estimating, [phone]
What's quoted
BRK-210 mounting bracket, 6082-T6 aluminium, clear anodised Drawing BRK-210 rev C, 250 at £8.40 each | £2,100.00 |
| Fixture and programming | £380.00 |
| First article inspection report | £95.00 |
| Carriage to your site | £45.00 |
| Subtotal | £2,620.00 |
| VAT at 20% | £524.00 |
| Total | £3,144.00 |
Price breaks
- 100 off
- £10.90 each
- 4 weeks
- 250 off
- £8.40 each
- 5 weeks
- 500 off
- £7.25 each
- 6 weeks
- Lead time
- First-off sample 3 weeks from order and approved drawing. Batch 2 weeks after you approve the sample.
- Delivery
- Delivered to your site, carriage as above.
- Payment
- 30 days from the invoice date. Fixture charge invoiced with the first-off sample.
- Assumptions
- Priced to drawing BRK-210 revision C. General tolerances as stated on the drawing. Material certificates included.
- Exclusions
- Packaging beyond boxed and labelled. Inspection beyond the first article report.
- Terms
- Subject to our terms and conditions of sale, attached. To accept, send a purchase order quoting Q-2026-0142.
The free quotation template sets these out. The job costing template and the markup calculator work out the price.
What's the difference between a quote and an estimate?
A quote is a fixed price for a defined job, and an estimate is your best guess at the cost while the job is still taking shape, so the final price can move. Trading standards guidance for businesses draws the same line. A quotation is normally a fixed price, and an estimate is a rough guess.
If the drawing, quantity or material isn't settled, call it an estimate or a budget price, and say what would change it.
Whether an estimate binds you, and what the law says when no price is fixed, is in Quote vs estimate.
| Question | Quotation | Estimate | Tender |
|---|---|---|---|
| What it is | A firm offer at a fixed price | Your best guess at the cost | A formal bid in the buyer's competition |
| Can the price change? | Only as the quote allows, such as a material surcharge | Yes, once the details are settled | Only as the tender rules allow |
| When it's used | Drawing, revision and quantity are fixed | Budget prices, early designs, prototypes | The buyer runs a formal process, often public sector |
| Whose format | Yours | Yours | The buyer's, by a deadline |
How is a tender different from a quotation?
A tender is a formal bid in a competition the buyer runs, on the buyer's forms and deadline, while a quotation is usually on your own terms. Public sector tenders are listed on GOV.UK: Contracts Finder for government contracts over £12,000, and Find a Tender for high-value contracts.
When does a quotation become binding?
A quotation is a fixed price offer that can't be changed once the customer accepts it. From then on you have to keep to the price, even if the job takes more work than you expected, so say in the quote exactly what it covers and what would lead to extra charges. If the customer's purchase order carries different terms, check them before you accept the order.
Checking the purchase order is covered in Sales order processing.
This is general information, not legal advice.
How long is a quotation valid for?
Until the date written on it. There's no set period, so pick one you can stand behind, such as 30 days, and shorten it when metal or energy prices are moving. Always write the date, or nobody knows how long your price stands.
The quotation above is dated 05/10/2026 and holds until 04/11/2026. If the customer comes back later, recheck material and outside-process prices before you confirm.
To chase a quote before its date runs out, use the four emails in How to follow up on a quote.
Where can AI help with quotes?
With the reading and typing around the price, such as logging the enquiry, finding past quotes for the same part and drafting the quotation from your estimate. The price and the sign-off stay with a named person.
Give it
- The enquiry and its drawings list
- Your finished estimate
- Past quotes for the same part
A person checks
- The price matches the estimate
- The revision is the one you priced
- The validity date and terms
The free check shows which of those jobs is worth handing over first, and what it costs you now.