Bill of materials template

A free bill of materials (BOM) template in Excel, Word and PDF. The Excel version works out each line cost and the total for one finished item.

Last checked 05/10/2026. Free, no email.

A filled-in bill of materials

A bracket assembly with two machined brackets, each cut from an aluminium blank, plus four dowel pins, four cap screws and a label. Material and bought-in parts come to £6.79 an assembly, before machining time.

[Your company name]

Bill of materials

Assembly
BA-400 bracket assembly
Drawing and revision
BA-400 rev B
Quantity to build
100
Prepared by and date
[Name], 05/10/2026
Parts
LevelPart numberDescriptionQty perTotal qtyMake or buyUnit costLine cost
0BA-400Bracket assembly11Make
1BRK-210Mounting bracket, 6082-T6, clear anodised22Make
2MAT-6082-106082-T6 plate, 10 mm, cut blank12Buy£2.15£4.30
1PIN-12Dowel pin, 6 x 20 mm, stainless44Buy£0.38£1.52
1SCR-M6-16Cap screw, M6 x 16, stainless44Buy£0.22£0.88
1LBL-01Part label, printed11Buy£0.09£0.09

Material and bought-in parts, one assembly

£6.79

Level 0 is the finished item. Level 1 parts go straight into it, and a level 2 part goes into the level 1 part above it. Total qty is how many go into one finished item: the quantity per, times the total of the part above. Line cost is total qty times unit cost. Made parts carry no unit cost here, because their cost comes from the material under them and the time on the routing. The downloads add unit and supplier columns.

What is a bill of materials?

A bill of materials (BOM) lists everything that goes into one finished item: each part, sub-assembly and raw material, with the quantity and where it comes from. Production builds from it, purchasing buys from it and estimating costs quotes from it.

The purchase order template orders this BOM's pins and screws for a build of 100.

What should a bill of materials include?

Each line needs a part number, description, quantity, unit, make or buy, supplier and cost. The header names the item and the drawing revision, so nobody builds or prices from an old one.

What's the difference between a single-level and a multi-level BOM?

A single-level BOM lists only the parts that go straight into the finished item. A multi-level, or indented, BOM also lists what goes into each of those parts, so a made part's material sits on the level below it. Use multi-level when you make sub-assemblies, so nothing is bought or costed twice.

What's the difference between an engineering BOM and a manufacturing BOM?

An engineering BOM lists the parts as the designer drew them. A manufacturing BOM adds what your works needs to build the item, such as blanks, consumables and packaging. Cost quotes and raise purchase orders from the manufacturing BOM.

The other kinds, such as assembly and phantom BOMs, are in What is a bill of materials?

How does a BOM help you quote?

The BOM gives the material cost of one item. Add machine and labour time from the routing, outside processes and overheads, then your mark-up, and you have the price. Keep BOMs current, so each quote starts from today's costs.

For 250 of the brackets, 250 blanks at £2.15 is £537.50 of material. Labour, machine time, anodising and overheads bring the cost to £1,750, and a 20% mark-up makes the price £2,100, or £8.40 each. The job costing example shows every line, and the quotation template takes the price from there.

Can AI build a bill of materials?

AI can draft a BOM from the parts list on a drawing, and fill in descriptions and suppliers from your past BOMs. A person checks every quantity and level, because a wrong quantity goes straight into the price and the purchase orders.

Give it

  • The drawing's parts list or the assembly drawing
  • Your past BOMs for similar items
  • Your part numbering rules

A person checks

  • Every quantity, at every level
  • Make or buy is right for your works
  • Nothing is listed twice