A filled-in NCR
The 250 brackets from the quotation template reached the customer on PO 88412, and 12 had the anodise scratched. The report runs from the customer's call on 16/11/2026 to the check that closed it.
[Your company name]
Quality, phone and email
Non-conformance report
- NCR number
- NCR-2026-0019
- Date raised
- 17/11/2026
- Part and revision
- BRK-210 rev C
- Order
- PO 88412
- Raised by
- [Name], quality
- Found at
- The customer's goods in
Reported by
- Company
- [Customer company]
- Contact
- [Name], goods in, [phone]
- Date found
- 16/11/2026
| Part number and description | Checked | Accepted | Rejected |
|---|---|---|---|
BRK-210 Mounting bracket, 6082-T6 aluminium, clear anodised | 250 | 238 | 12 |
- Required
- Clear anodised finish, drawing BRK-210 rev C
- Found
- Anodise scratched through to bare metal on the mounting face of 12 brackets
- Containment
- The customer's goods in checked all 250 and set the 12 aside. Anodised parts waiting to go out were checked at despatch and had no marks.
- Disposition
- Scrap the 12. The customer's buyer chose a credit over a remake, for 12 at £8.40, £100.80 plus VAT.
- Root cause
- Packed loose in two layers with nothing between them, so the brackets rubbed together in transit
- Corrective action
- Pack anodised parts in single layers with card between them. [Name], despatch, updates the packing instruction by 20/11/2026.
- Closed
- The next anodised despatch was checked at packing and had no marks
[Name], quality
Raised by
[Name], works manager
Approved by
23/11/2026
Date closed
What is a non-conformance report?
An NCR covers one problem from the day it's found to the day it's closed, whether that's a supplier's parts at goods in, your own parts in production or parts a customer rejects.
How do you fill in a non-conformance report?
Work down the report in six steps, with a name and a date against each, so anyone can see how far it has got.
- Say what's wrong against the drawing or order, and count how many.
- Contain it the same day, setting the parts aside and checking anything that could share the fault.
- Decide the disposition and get it agreed.
- Find the root cause, asking why until you reach something you can change.
- Take corrective action, with an owner and a date.
- Check it worked before you close the report.
The Excel download adds a log of open NCRs, with who owns each action and when it's due.
What can you do with the rejected parts?
One of four, and the report records who agreed it. A customer's written agreement to take parts as they are is often called a concession.
| Disposition | Use it when |
|---|---|
| Use as is | The part still does its job, and the customer agrees in writing |
| Rework | The part can be brought back to the drawing, then inspected again |
| Scrap | It can't be saved, or saving it costs more than a new one |
| Return to supplier | A bought-in part was wrong when it arrived |
Should you replace the parts or credit them?
Either, if the customer agrees. Free replacements need no credit note, because HMRC lets the original VAT charge stand and you don't account for VAT on them. A credit needs a credit note against the original VAT invoice.
Source: GOV.UK, VAT guide (VAT Notice 700), paragraph 18.3.
What's the difference between an NCR and a corrective action?
The NCR deals with the parts in front of you, and the corrective action with the cause, so the fault doesn't come back on the next batch. This template keeps both on one form.
| Question | Non-conformance report | Corrective action |
|---|---|---|
| Asks | What happens to these 12? | What stops it happening again? |
| On the sample | Scrap the 12 and credit them | Pack anodised parts in single layers with card between them |
| Closed when | The parts are dealt with | A check shows the change works |
Who raises an NCR?
Whoever finds the problem, at goods in, in production or on a customer's call. A works manager or someone in quality then agrees the disposition and signs the report off.
For a supplier's parts, write the fault on their delivery note before you sign it, then raise the NCR against your purchase order.
Can AI help with NCRs?
AI can draft the NCR from the customer's email and photos, and find past NCRs for the same part or cause. A person decides what happens to the parts and signs the report off.
Give it
- The customer's email and photos
- The order and the drawing
- Your past NCRs
A person checks
- The count and the disposition
- The root cause
- Sign-off before it closes