A filled-in quotation
250 machined aluminium brackets to drawing BRK-210 revision C, with a first-off sample. The job costing example shows the costs behind the £8.40 price.
Quotation Q-2026-0142
250 machined brackets
- Date
- 05/10/2026
- Valid until
- 04/11/2026
- Your reference
- RFQ 5531
- Quotation for
- [Customer company], [contact name]
- Prepared by
- [Name], estimating, [phone]
What's quoted
BRK-210 mounting bracket, 6082-T6 aluminium, clear anodised Drawing BRK-210 rev C, 250 at £8.40 each | £2,100.00 |
| Fixture and programming | £380.00 |
| First article inspection report | £95.00 |
| Carriage to your site | £45.00 |
| Subtotal | £2,620.00 |
| VAT at 20% | £524.00 |
| Total | £3,144.00 |
Price breaks
- 100 off
- £10.90 each
- 4 weeks
- 250 off
- £8.40 each
- 5 weeks
- 500 off
- £7.25 each
- 6 weeks
- Lead time
- First-off sample 3 weeks from order and approved drawing. Batch 2 weeks after you approve the sample.
- Delivery
- Delivered to your site, carriage as above.
- Payment
- 30 days from the invoice date. Fixture charge invoiced with the first-off sample.
- Assumptions
- Priced to drawing BRK-210 revision C. General tolerances as stated on the drawing. Material certificates included.
- Exclusions
- Packaging beyond boxed and labelled. Inspection beyond the first article report.
- Terms
- Subject to our terms and conditions of sale, attached. To accept, send a purchase order quoting Q-2026-0142.
What is a quotation?
A quotation is a written offer to supply goods or work at a stated price, on stated terms, until a stated date. In manufacturing it answers a customer's request for quotation (RFQ).
What should a manufacturing quotation include?
The part and its drawing revision, quantities and price breaks, one-off charges such as tooling, the lead time, delivery and payment terms, your assumptions and how long the price holds.
Show VAT on its own line, at the standard UK rate of 20%. For exports, name one of the eleven Incoterms® rules from the International Chamber of Commerce, with the place, such as "EXW our works".
How do you write a quotation?
Start from the enquiry and your finished estimate, then work through nine steps before it goes.
- Check the enquiry is complete. Chase a missing revision, quantity, material, finish or date before anything else.
- Price it from your estimate of material, machine time, labour, outside processes and margin.
- Add price breaks for the quantities the customer is likely to order next.
- List one-off charges on their own lines: tooling, fixtures, programming, inspection reports and carriage.
- Give a lead time production has agreed, and say whether it runs from order, approved drawings or sample approval.
- Write down your assumptions and exclusions, meaning anything you priced that the enquiry didn't say.
- Set the validity date and attach your terms of sale.
- Have a second person check the price, the drawing revision and the lead time.
- Send it, log it and diary a follow-up for a few days before the validity date.
The job costing template sets out the estimate behind the price, and the markup calculator turns that cost into a price at the margin or markup you want, before and after VAT.
For the follow-up, How to follow up on a quote has four short emails timed to the validity date.
What's the difference between a quote and an estimate?
A quotation is a firm price for a defined job, open until its validity date. An estimate is your best idea of the cost while the job is still taking shape, so the price can move.
Quotes, estimates and tenders are compared side by side in What is a quotation?
How long should a quotation be valid for?
Long enough for the customer to raise an order, short enough that material and outside-process costs still hold. Pick a period you can stand behind, such as 30 days, shorten it when metal or energy prices move, and write the end date on the quote.
The quotation above is dated 05/10/2026 and holds for 30 days, until 04/11/2026.
Is a quote legally binding?
A quotation is a fixed price offer that can't be changed once the customer accepts it. From then on you have to keep to the price, even if the job takes more work than you expected, so say in the quote exactly what it covers and what would lead to extra charges. If their purchase order carries different terms, check which apply before you accept it, and ask a solicitor when it matters.
What applies when you only gave an estimate is in Quote vs estimate.
This is general information, not legal advice.
What payment terms should a quote state?
State the payment period, such as 30 days from invoice, and any tooling deposit. If no date is agreed, a business payment is late 30 days after the customer gets the invoice or the goods, whichever is later, and you can claim statutory interest at 8% plus the Bank of England base rate unless your contract sets another rate.
Source: GOV.UK, Late commercial payments.
To be paid before you start, send the quoted total as a proforma invoice.
How do you send a quotation by email?
Attach the quotation as a PDF, put both references in the subject line, and keep the email to the price, lead time, validity date and who to call. For example:
Subject: Quotation Q-2026-0142 for your RFQ 5531, BRK-210 brackets
Hello [name],
Thank you for the enquiry. Our quotation is attached: 250 brackets to drawing BRK-210 revision C at £8.40 each, with a first-off sample three weeks from your order.
The price holds until 04/11/2026. We've listed what we assumed under "Assumptions", so please check those points.
If anything needs changing, call me on [number].
[Your name]
For a revised quote, or one with a fixed delivery date to meet, the quote email template has an email to copy for each.
Can AI write a quotation?
AI can draft the quotation from your estimate, the enquiry and your standard wording. Your estimator sets the price, and a named person checks the draft before it goes.
Give it
- The enquiry and the drawing list
- Your finished estimate
- Your standard quote wording and terms
- Past quotes for similar parts
A person checks
- The prices match the estimate
- The drawing revision is the one you priced
- Production has agreed the lead time
- The assumptions are right for this job